The following works are scheduled on the M23, subject to weather conditions. 

Monday to Friday 07:00 to 19:00 daily for 7 weeks

Full closure of J10 exit slip Northbound. Diversion to J9 and back southbound to Junction 10.

Monday 13 to Sunday 19 July (inclusive) 20:00 to 06:00

Full closure from J8 to J10 Southbound

Diversion to Brighton via J6 M25, A22, A264 Copthorne Road and join at J10 M23. Diversion for Gatwick, traffic continues to J10 M23, A2011 Crawley Avenue, A23 London Road, Airport Way.

Full closure of the Reigate to Crawley Link

Diversion to M25 J6 and follow A22, A264 to M23 J10.

Full closure of the Godstone to Crawley Link

Diversion to M25 J8, back to J6 and follow A22, A264 diversion to M23 J10.

Full closure of J9 entry slip Southbound (Gatwick Spur)

Diversion via Airport Way, A23 London Road, A2011 Crawley Avenue and join the M23 at J10.

Monday 13 to Sunday 19 July (inclusive) 20:00 to 06:00

Full closure of the Reigate to Hooley Link

Diversion to M25 J6 and follow A22 towards Caterham.

Full closure of the Godstone to Hooley Link

Diversion to M25 J8, back to J6 and follow A22 diversion towards Caterham.

Monday 13 July 2020 to Wednesday 15 July 2020 – Full closure Junction 10 to 9 M25 anticlockwise

Connect Plus Services work on behalf of Highways England, and will be carrying out drainage clearance of gullies, linear and catch pits, sign cleaning/maintenance, vegetation clearance from signs, verge and associated hazardous trees, sweeping of detritus and removal of litter and debris from verge and central reservation, repairs to carriageway potholes, replacement of loop detectors, repairs and inspection of safety fence, resurfacing, road marking and stud replacement works, drainage inspections, structures inspections and street lighting inspections, repairs and maintenance.

In order to carry out these works as efficiently and as safely as possible they will be installing a closure on the main carriageway from 9pm and the total closure will be established from 10pm, taking traffic off at junction 10 on the M25 anti clockwise. There will be a fully signed diversion route in place from junction 10 on the M25, travel north on the A3 to the Tolworth junction A240, continue back onto the A3 southbound to the A243 (caution low bridge on the A240), continue southbound on the A243 to junction 9 of the M25, where you will re join the main carriageway.